Cloud Migration Assessment: What It Covers and How to Run One

Written by

Dino Starcic

·

CEO

A cloud migration assessment is the work you do before you move anything: an inventory of your applications, data and dependencies, a decision for each one (move, change, replace, retire or keep), and a cost and timeline the business can approve. Done well, it turns “we should be on AWS” into a short list of first workloads, a wave plan and a rollback plan. Our AWS migration and modernization service is built around that sequence, with senior AWS engineers working through a shared backlog so the assessment turns into real tasks instead of a slide deck.

This guide is for the people who have to decide and then deliver: founders, CTOs and engineering leads who want a migration plan that holds up in practice.

Cloudwisecloudwise.orgTurn Migration Plans Into Cloud TasksCloudwise pairs senior AWS engineers with a shared backlog to support day-to-day cloud operations, including infrastructure management and cost optimization.Visit

TL;DR

  • A migration assessment answers four things for every application: should it change, which strategy fits, what evidence supports that, and what it costs and when it happens.

  • Inventory and dependency mapping are the core. Undocumented dependencies are the most common cause of cutover failure.

  • AWS’s own guidance says roughly 70 percent of workloads can be rehosted, relocated or replatformed, so most assessments end with a fast, simple first wave.

  • Downtime is mostly decided before cutover: window choice, rollback plan, phased traffic shifting and database replication.

  • You can run the assessment in a few weeks and move straight into wave one if the same engineers who assess also execute.

Table of Contents

  • What a cloud migration assessment actually decides

  • Cloud migration readiness: the six areas to check

  • How to run the assessment, step by step

  • What the finished assessment should contain

  • AWS migration downtime: what drives it and how to cut it

  • Common mistakes in migration assessments

  • Where Cloudwise fits

  • FAQ

  • Sources

What a cloud migration assessment actually decides

The label sounds like a report. In practice it is a set of decisions. AWS describes its Migration Readiness Assessment as a way to see how far along an organization is in its cloud journey, where its gaps are, and what action plan closes them, organized around six perspectives: business, people, governance, platform, security and operations.

The assessment phase also includes rapid discovery and a high-level total cost of ownership (TCO) comparison. TCO means the full cost of running something, not only the server bill: licenses, staff time, support, and the cost of moving it. Together these give you a picture of what will move, a business case, and the commitment you need from stakeholders to fund it.

A useful assessment leaves you able to answer these questions:

  1. Which applications move, which are retired and which stay where they are?

  2. In what order, and in how many waves?

  3. What will it cost to move, and what will it cost to run afterward?

  4. What could break, and how do we undo it?

  5. Who owns each step?

If your assessment output cannot answer those five, it is an inventory, not an assessment.

Cloud migration readiness: the six areas to check

Readiness is about the organization as much as the servers. AWS’s Migration Readiness Assessment is a facilitated session, typically a 4 to 6 hour meeting built on a Cloud Adoption Framework question set, followed by analysis and a debrief that documents observations and next steps. Startups and small teams can compress this into a working session, but the six areas are worth covering every time.

Area

What you are checking

Typical gap

Business

Why you are moving and what success looks like

Goals like “modernize” with no measurable target

People

Who has AWS skills and time to spend on migration

Day-to-day engineers are also the migration team

Governance

Budget ownership, tagging, cost accountability

No owner for the AWS bill

Platform

Landing zone, networking, account structure

Everything in one account, no environments separated

Security

Identity, encryption, logging, compliance needs

Shared credentials, unclear data classification

Operations

Monitoring, backups, incident response

No runbooks for the new environment

The people row decides more migrations than any technical factor. A small team cannot run production, build features and learn a new platform at once. That is why many teams hand the operational side to outside engineers on a subscription rather than hiring a full in-house DevOps team before the move.

How to run the assessment, step by step

1. Write down the business drivers

Start with the reason. Cost reduction, a compliance deadline, a data center lease ending, scaling pain and a product launch all produce different plans. AWS’s portfolio assessment guidance lists documented business drivers and goals as the first output, for a reason: every later trade-off, such as speed against cost, refers back to it.

Write two or three measurable targets, for example “exit the colocation contract by a set quarter” or “cut deployment time from days to hours.”

2. Inventory what you run

List every application, server, database, scheduled job and third-party integration. For each workload, Microsoft’s Cloud Adoption Framework (written for Azure, but the method is cloud-neutral) says to collect baseline metrics such as CPU, memory, disk I/O, network throughput, peak concurrency and response times, plus configuration and licensing details.

The baseline is what lets you size AWS resources honestly. Copying on-premises server sizes into the cloud usually means paying for capacity you never used. Peak figures matter too: size for the busiest hour of the year, not the average Tuesday.

Where it goes wrong: spreadsheets built from memory. Use discovery tooling and then have the people who own each application correct it.

2. Inventory what you run

3. Map dependencies

This step prevents most failed cutovers. One cloud readiness guide states that undocumented dependencies are the most common cause of cutover failure; the same pattern shows up in AWS’s wave planning advice, which builds waves from dependency groups, not from individual servers.

Microsoft’s framework recommends mapping internal and external dependencies using network monitoring and owner interviews. Do both. Traffic data shows what talks to what; interviews catch the monthly batch job and the vendor SFTP server that never shows up in a one-week capture.

4. Inventory security and compliance requirements

List service accounts, credentials, encryption settings and firewall rules, and document the regulations each workload falls under, such as HIPAA, SOC 2 or ISO 27001. The same Microsoft guidance asks for recovery objectives (RPO and RTO), SLAs and regulatory requirements per workload. RPO is how much data loss you can tolerate; RTO is how long you can be down.

If an audit is on your calendar, plan it now. Our compliance and audit readiness service covers SOC 2, ISO 27001 and HIPAA preparation on AWS, which is easier to design in than to retrofit after the move.

5. Choose a strategy for each application

AWS names seven migration strategies: retire, retain, rehost, relocate, repurchase, replatform, and refactor or re-architect. In plain terms:

  • Retire: switch it off.

  • Retain: leave it where it is for now.

  • Rehost: move it as-is to AWS servers (“lift and shift”).

  • Relocate: move it to AWS without changes to the underlying platform, such as moving a VMware workload.

  • Repurchase: replace it with a SaaS product.

  • Replatform: make small changes, such as moving a self-managed database to a managed one.

  • Refactor: rebuild it for cloud-native services.

AWS says that typically about 70 percent of workloads can be rehosted, relocated or replatformed, and another 5 percent retired. Its executive guidance advises rehosting first, except for specialized workloads such as mainframe, Oracle and SAP that need modernization before they move. The same guidance notes that refactoring to cloud-native services can lead to far larger gains than a plain rehost, which is why many teams rehost first and modernize in later waves.

6. Build the directional business case

A directional business case is an early, approximate comparison of current cost against AWS cost, good enough to approve the project. AWS suggests building it over the same period as your hardware refresh cycle, typically five years, and calculating net present value, payback period in months, run-rate comparison and ROI.

For effort, AWS gives indicative rehost ranges of 10 to 14 person hours per server for low-complexity applications, 16 to 24 for medium and 26 to 38 for high, with extra hours for high availability and disaster recovery testing. Use them as a sanity check on your own estimate, not a quote. The same page recommends deferring refactoring estimates to the detailed business case because they are complex.

For current-state cost, AWS Migration Evaluator is a free service that does agentless discovery, cost benchmarking and right-sizing, but assesses only x86 Windows and Linux servers and does not model migration costs. Add your own migration labor and the post-migration run costs. Our cost optimization and FinOps service exists for the run-cost side, so the number in the business case matches the bill you later receive.

6. Build the directional business case

7. Pick the first applications and plan waves

A wave is a group of applications moved together. AWS recommends keeping each wave within 6 to 10 weeks and structuring it as design, cutover planning, pre-migration, cutover, hypercare (a short period of close monitoring after go-live) and closure.

For the first wave, AWS suggests low-risk, low-complexity pilots, for example applications with zero to three dependencies that can be rehosted as-is in a development or test environment. The assessment itself should name three to five initial candidates. Pilots teach your team the tooling, networking and approval process on workloads where a mistake is cheap.

What the finished assessment should contain

AWS’s guidance lists the primary outcomes of an early assessment: documented drivers, an application and infrastructure inventory with known data gaps, an indicative strategy per application, a directional business case, three to five first candidates and defined next steps. Later stages add a high-fidelity inventory, a high-confidence wave plan and a detailed business case, on an indicative timeline of about 15 weeks for the full portfolio journey.

A small company does not need 15 weeks. A practical test for “done”: a CFO could approve the budget from it, and an engineering lead could staff the first wave from it. If either cannot, keep going.

AWS migration downtime: what drives it and how to cut it

Downtime is the question that worries non-technical stakeholders most, and the assessment is where you answer it. Three factors set the number: how much data must be copied, how tightly your applications depend on each other, and how short the business wants the cutover window to be.

AWS’s cutover guidance is direct about the trade-off: shorter cutover windows generally increase complexity, and business-critical applications usually need shorter windows, which raises risk and planning effort. The same guidance recommends:

  • Pick the window by user traffic. The best time is when fewest users are active, balanced against support-team availability. A 3 a.m. window with nobody on call is not a good window.

  • Write the rollback procedure before cutover. Document how long rollback takes and what it needs, and decide in advance the point at which you trigger it.

  • Use phased (canary) cutovers where possible. Move a percentage of servers or services first and route traffic to both environments through load balancing or DNS policy, so a problem affects a small share of users.

For databases, the biggest downtime lever is continuous replication. AWS Database Migration Service is designed so the source database stays operational during migration, which helps minimize downtime for dependent applications. The final cutover then shrinks to a short switch, not a long copy.

In your assessment, record for each application: acceptable downtime, estimated rollback time, dependencies that must switch at the same time, and who tests after cutover. Those four fields turn a vague worry into a plan.

Common mistakes in migration assessments

  • Assessing servers, not applications. Servers are the infrastructure; applications are what the business cares about. Decisions belong at the application level.

  • Treating the assessment as a one-time score. Inventories drift. Refresh the data before each wave.

  • Skipping security design. Identity, logging and encryption are easier to set up in the landing zone than to add after workloads arrive.

  • Ignoring the day-two bill. Right-sizing and savings plans belong in the plan, not in a cleanup project six months later. Our AWS optimization score gives you a quick read on where an existing AWS environment stands.

  • No plan for monitoring. A migrated workload you cannot observe is a risk. See our guide to cloud observability on AWS for what to set up.

  • Handing the whole thing to a report-only engagement. An assessment nobody executes is shelfware.

Where Cloudwise fits

The assessment is the easy part to schedule and the hard part to finish, because the same engineers who would run it are busy running production. Cloudwise gives you senior AWS and DevOps engineers on a subscription, with requests submitted to a shared backlog and a typical 24 to 48 hour response time. Migrations and modernization are one of the services included, alongside AWS infrastructure management, DevOps automation with CI/CD, monitoring, security and cost optimization.

There is no hourly billing and no long-term contract. The Simplest Subscription is $7,499 per month, and you can cancel anytime. That means inventory, dependency mapping, landing zone work, cutover tasks and post-migration cost tuning can sit in one backlog that you reprioritize as the plan changes. See the pricing page for what the subscription includes.

Cloudwise

If you already know your first wave, bring it to the backlog. If you do not, the assessment is the first ticket.

Sources

Recommended

Questions Answered

Frequently asked questions

Clear answers to common questions about our AWS & DevOps subscription and how it works.

How long does a cloud migration assessment take?

Add Icon

Which AWS tools help with migration planning?

Add Icon

Should I rehost first or modernize during the move?

Add Icon

How long does a cloud migration assessment take?

Add Icon

Which AWS tools help with migration planning?

Add Icon

Should I rehost first or modernize during the move?

Add Icon

What is the difference between a migration assessment and a readiness assessment?

Add Icon

How do I keep AWS migration downtime low?

Add Icon

What is the difference between a migration assessment and a readiness assessment?

Add Icon

How do I keep AWS migration downtime low?

Add Icon

What is the difference between a migration assessment and a readiness assessment?

Add Icon

How do I keep AWS migration downtime low?